Phase Current Differential (87) Test
Functional testing is a way to assess this protection system’s suitability for your application. Functional
testing goes beyond the more basic tests found in acceptance testing, but lacks the detailed function
testing that is part of the commissioning process.
Test each of the following functions to verify that this BE1-11g measures accurately, is within specified
tolerances, and operates correctly. These tests are also suitable for assisting in systematic
troubleshooting in the event that an operation is questioned. Revisiting the test of a specific function can
help verify whether the BE1-11g is operating within specified tolerances. For further assistance, contact
Basler Electric, Technical Sales Support.
Refer to the Terminals and Connectors chapter for terminal locations and connections.
Reset all targets prior to each test by navigating to the Metering > Status > Targets screen and pressing
the front-panel Reset key. Enter the appropriate username and password if prompted. Clear all logic prior
to each test by using the Settings Explorer in BESTCOMSPlus® to open the BESTlogicPlus
Programmable Logic screen and click the Clear button located on the toolbar. After new BESTlogicPlus
settings are made, click the Save button located on the toolbar to compile BESTlogicPlus. Upload
BESTlogicPlus settings by selecting Upload Logic to Device from the Communication pull-down menu.
Operational settings can be sent by selecting Upload Settings to Device from the Communication pull-
down menu or by clicking the Send Settings button on the toolbar.
The actual operating time of an output contact is equal to the recognition time plus the time delay setting
(accuracy) plus 6 milliseconds. Output contact operating time depends upon the type of test set used and
its operating characteristics.
A Functional Test Report is included at the end of this chapter. It should be used to record the results and
verify pickup and timing accuracy.
Refer to the Phase Current Differential (87) Protection chapter for more information on this function.
Restrained Functional Test Procedure
Pickup Verification (Maximum Restraint)
Step 1: Use BESTCOMSPlus to send the operational settings in Table 219. Reset all targets.
Table 219. Operational Settings (87R - Maximum)
Setting
Value
BESTCOMSPlus Screen
Description
Nominal Phase
Voltage
69.3 V
System Parameters, Power System
Sets the nominal
secondary sensing voltage
to 69.3 V
Nominal Phase
Current
5 A
System Parameters, Power System
Sets the nominal
secondary sensing current
to 5 A
Nominal Aux.
Voltage
69.3 V
System Parameters, Power System
Sets the nominal
secondary auxiliary voltage
to 69.3 V
Phase CT 1 Ratio
1
System Parameters, Sensing
Transformers
Sets the phase CT 1 ratio
to 1
CT 1 Connection
WYE
System Parameters, Sensing
Transformers
Sets the CT 1 connection
to WYE
Phase CT 2 Ratio
1
System Parameters, Sensing
Transformers
Sets the phase CT 2 ratio
to 1
BE1-11g Phase Current Differential (87) Test